Definition for those who I lost. Lofting is taking a set of numbers which are included in a Table of Offset. These numbers define the shape of the ...
I decided to start off with a little prep for this build and make a few samples. The Kayak will be built with an Internal frame which consist of f...
I have wanted to build a Kayak for some time now, and I finally have a shop that I can build in. I have spent a few years reading up on boat buildi...
Back at it this evening finally, other stuff to be done around the house and errands. I did a little sanding on the interior pieces and glued up t...
I will back up a bit to start. This is what the bottom of the post looks like.I will be able to lock it in place to the layout line. [20230815_192...
Had to work out some the functions on this build her: 1) A secure verticle post. 2) A bar with a stop block 3) A indexing system 4) A locking syste...
I did a open segment back in the spring for a swap and had some difficulties getting all of those little pieces glued together. So, this has been o...
This is where I made a few adjustments to the plans. The plans called for a 1-1/2" steel pipe (no luck sourcing anything local) I did have a few ...
Removed the clamps and everything looked good, had to scrap some glue excess off. The first thing up was to cut the curves at the top and bottom o...
Received the Acme Threads for this project. I did not want to drill any holes until I had them in hand to measure for the clearance needed. I set ...
I decided to shape the Jaws on this while waiting for the order to arrive. THe Jaws consist of two sets, one is smoth which I will attach some leat...
I saw a plan for a High Vise, which looked sturdy and it raises the work up to be seen better and no bending over. This is out of "Shop Notes" Vol ...