PROJECT NUMBER 8,276.3:

1) Make a box, big enough to hold the gallon and 3/4 gallon jugs of 2:1 epoxy, the two half gallon 50-50  epoxy, maybe room for a future Alumalite purchase, one gallon of Titebond, and room for dispensers, like this.

2) Leave enough room to  line it with insulation, over which I would add sides, top and bottom.

3) Add one twenty watt bulb

4) Install a door 

5) Make use of that old analog thermometer to monitor temp.